At this point, the roof could be set up — or at the very least loaded— previous to putting in the doors and windows. This permits the building envelope to settle. In that situation Renovate first makes a branch and involved Pull Request, and after that automerges the PR with https://elliottacdbz.blogchaat.com/32778736/pile-fundamentals-explained