Scheduling is part of the decision. An urgent fault and a planned upgrade should not be written as if they take the same slot.
A useful page about Jimsexcelauto names the job, the constraint, and what a reader should https://auto-repair496692.blogpixi.com/43617471/how-auto-mechanic-in-bechtelsville-pa-is-usually-handled